mondi-1After completion of Phase 1, consisting of the reconstruction of a printing hall and the construction of the building technology centre, a 600m2 storage unit in framing construction on a monolithic foundation with a panel front was built during continuous operation. Additionally a 1600m2 big employee parking space to ease the inbound logistics.

The project could be finished two months ahead schedule, which made it possible to use the facilities already in the last months of 2014.

 